Solutions provided by Waterlab Services

More than 2,250 m of drinking water and wastewater piping installed, two  60 m³ fire water storage tanks, two wastewater flexible tanks with a capacity of 70 m³, and some 20 wastewater lifting pumps. Approximately 80 hours of labour between two people for the set up and dismantling of the facilities. 12 health checks on the water supplied by an independent accredited laboratory: results all 100% ok

Client

WC Loc for the VYV Festival

Waterlab and WC Loc are part of the Enygea Group.
Both subsidiaries have complementary skills: WC Loc specializes in mobile sanitary facilities and Waterlab manages all temporary water networks.
For this largescale project, which included a need for the supply of drinking water and fire water storage tanks, WC Loc turned to the Waterlab Services team.

Request

Festival drinking water supply and wastewater collection

Drinking water supply and wastewater collection at the festival site (sanitary blocks, volunteer area/VIP area/technical catering/handwashing stations/urinals) + 60 m³ fire water storage tanks to meet firefighting needs in the event of a fire.

Un projet à nous confier ?
Contactez-nous !
Titre alternatif

⚡ Votre navigateur est obsolète ! ⚡

Mettez-le à jour pour voir ce site correctement.

Mettre à jour